Irrigation systems should be started in the spring to assess the functionality of all components. Our team of technicians will perform the following tasks when opening your system:
-Turn on water valves to pressurize the irrigation system
-Check the backflow preventer for winter damage.
-Turn on each zone and check for proper rotary and spray head orientation
-Adjust rotary and spray heads as needed.
-Test controller and update settings.
-Test the rain sensor.
-Check for any damaged components including pipes and wires and report necessary repairs and estimated costs.
-Repairs are billed on an hourly basis plus parts.